No. 1, South Jixiang Road, Guodian Town, Xinzheng City, Henan Province +86-17513176620 [email protected]
Project Overview Project Name: Shanghai Fengxian JW Marriott Hotel Curtain Wall & Decoration EngineeringService Period: 2018-2020Project Type: Five-Star Resort HotelService Scope: Integrated Solutions for Metal Curtain Walls, Stone Curtain Walls,...
Project Overview
Project Name: Shanghai Fengxian JW Marriott Hotel Curtain Wall & Decoration Engineering
Service Period: 2018-2020
Project Type: Five-Star Resort Hotel
Service Scope: Integrated Solutions for Metal Curtain Walls, Stone Curtain Walls, and Energy-Efficient Window Systems
Project Background & Core Challenges
As the first international luxury resort hotel in the Fengxian area, the JW Marriott Hotel's facade design integrates modern aesthetics with natural landscape elements, presenting three core challenges:
1. Balancing Aesthetics and Functionality – Achieving seamless integration of curved architectural forms with high-performance curtain wall systems
2. Durability in Coastal Environment – Addressing corrosion challenges from high salt mist and humidity near Hangzhou Bay
3. Integration of Indoor and Outdoor Experiences – Maximizing scenic views while ensuring energy efficiency and comfort
Jixiang Building Materials Solutions
1. Customized Curtain Wall System Design
· Double-curved Aluminum Panel Curtain Wall: Utilizing 3D modeling and digital processing technology to accurately realize the architect's fluid design concept
· Natural Stone Curtain Wall: Selected Portuguese beige stone, ensuring safety and aesthetics through back-bolt dry-hanging systems
· High-performance Window Wall System: Ultra-narrow frame design maximizing panoramic views
2. Specialized Protection for Coastal Environments
· Anti-corrosion Treatment: Aluminum profiles treated with fluorocarbon spray + anodizing composite process, passing 3000-hour salt spray test
· Waterproof and Breathable System: Three-layer waterproof design ensuring airtightness while allowing internal moisture release
· Typhoon Resistance Design: Curtain wall system passed dynamic wind pressure testing, meeting coastal area wind resistance requirements
3. Energy Efficiency and Comfort Optimization
· Energy-efficient Glass Configuration: Triple silver Low-E insulating glass with 65% visible light transmittance and solar heat gain coefficient ≤0.3
· Thermal Break Design: All metal connectors equipped with nylon thermal insulation pads, improving overall thermal performance by 40%
· Noise Control: Curtain wall system achieves Rw 45dB airborne sound insulation, ensuring quiet guest room environments
Technical Highlights and Innovations
1. Digital Construction Technology
· Full-cycle BIM Application: BIM collaboration throughout design to installation, reducing on-site changes by 35%
· Prefabricated Assembly Construction: 85% factory prefabrication of curtain wall units, improving on-site installation efficiency by 50%
· Drone Inspection System: Utilizing drones for progress monitoring and quality inspection
2. Green Building Technology
· Recyclable Material Application: 90% aluminum recovery rate, 95% stone utilization rate
· Energy Performance: Overall curtain wall system thermal transmittance K-value ≤1.5 W/(㎡·K)
· Water-saving Design: Integration of curtain wall drainage system with building rainwater recycling system
Project Results and Value
Customer Value Realization
1. Aesthetic Value: Perfect realization of design concept, hotel facade awarded "Shanghai Outstanding Building Exterior Design Award"
2. Time Value: Construction period shortened by 4 months compared to traditional methods, enabling earlier hotel opening
3. Cost Value: 15% reduction in comprehensive costs through standardized design and prefabricated production
4. Long-term Value: Zero curtain wall system failures in 3 years of operation, 60% reduction in maintenance costs
Performance Indicators Achieved
· Air Permeability: Achieved highest national standard (Grade 8)
· Water Tightness: Passed 2500Pa dynamic water penetration test
· Seismic Performance: Met Shanghai area seismic fortification requirements
· Durability: 10-year quality guarantee, expected service life over 30 years
Jixiang Building Materials Service Features
Full-process Service Model
1. Design Collaboration Phase: Working simultaneously with architects and interior designers to resolve technical challenges early
2. Production Assurance Phase: In-house production facilities with full-process quality control
3. Construction Management Phase: Project manager + technical engineer dual responsibility system
4. Post-construction Maintenance Phase: Providing regular inspections and preventive maintenance services
Specialized Technical Team
· Hotel Project Experience Team: Average industry experience over 12 years
· International Brand Collaboration Experience: Familiar with Marriott brand standards and requirements
Jixiang Building Materials – Creating Architectural Integrity with Professional Craftsmanship
We deliver not just materials, but complete facade solutions that enhance hotel experiences, protect investments, and create lasting value for luxury hospitality brands.